top of page

Pipeline Design Project
As part of my design project course, I managed to save about $5 million from the initial cost proposed to deliver water in a remote area in Australia. By performing cost analysis and data modelling using Microsoft Excel, I manage to generate one of the most cost-effective proposals. Whilst doing it, I also reviewed construction feasibility by forecasting models with various pumps and pipes models in a technical report writing. This is done by plotting the pipeline, the EGL and HGL for the lowest cost solution.
bottom of page